TIA : How Rekarunding Trafik SB Powers EVCC™ Pedas RSA’s Future with Traffic Insights

Updated: Aug 21

ree

In shaping a next-generation highway rest stop like EVCC™ Pedas RSA, infrastructure is only half the equation. The other half? Traffic Intelligence—and for that, Levn Capital entrusted Rekarunding Trafik Sdn. Bhd., one of Malaysia’s most respected traffic and transportation consultants, to lead the Traffic Impact Assessment (TIA) for the development.


With over 25 years of specialized expertise across expressways, urban centers, toll revenue forecasting, and regional highway studies, Rekarunding Trafik’s involvement ensures that every lane into and out of EVCC™ Pedas RSA is engineered for performance, safety, and scalability.



About Rekarunding Trafik: Malaysia’s Traffic Engineering Specialist


Founded in 2017 and led by veteran transport engineers including Shamshuddin Ab Jalal (M.Sc. Transportation Planning, MCIHT) and Wan Buliana Wan Senik (B. Urban & Regional Planning), Rekarunding Trafik is backed by a legacy of major traffic studies for:


  • Malaysia Vision Valley (MVV) expressway plans

  • Kuala Lumpur–Kuala Selangor Expressway (KLSE)

  • Public transit terminals in Shah Alam and Johor Bahru

  • International ports and oil terminal studies in Johor and Melaka

  • The East Coast and West Coast Expressway corridor models


Their multidisciplinary team employs advanced simulation tools such as SIDRA, VISSIM, EMME, and Paramics, enabling precise analysis for both current traffic and future projections.



Key Findings from the EVCC™ Pedas RSA TIA Report


Commissioned in 2022, the TIA for EVCC™ Pedas RSA (located at KM241 (Southbound) PLUS Expressway) provided robust traffic modeling and volume projections. Here are the highlights:


Existing Demand is High—And Growing


  • Over 67,000 vehicles per day (16-hour count) were recorded between Senawang and Pedas/Linggi (Oct 2022)

  • Car/Van/Taxi dominates usage: 89.7% of traffic composition

  • Peak hour was recorded between 8:15–8:30 AM, with over 1,200 vehicles



Projected Traffic Surpassing 175,000 by 2060


Based on 24-hour projections validated by Rekarunding Trafik, EVCC™ Pedas RSA is strategically positioned along a steadily growing expressway corridor. The anticipated growth highlights the site's long-term commercial relevance:


  • 84,101 vehicles/day by 2025

  • 110,118 vehicles/day by 2035

  • 175,162 vehicles/day by 2060


This consistent year-on-year growth—averaging between 3.19% in the early years and stabilizing at ~1.5% post-2045—reinforces the long-term viability of EVCC™ Pedas RSA as a flagship RSA catering to high-throughput private and commercial highway users.



Implications for Design and Capacity


The report guided several key aspects of the RSA’s planning:


  • Vehicle-type distribution, informing parking allocation for heavy trucks, buses, and private vehicles

  • Ingress/Egress point configuration, designed to maintain uninterrupted flow into PLUS E2 Expressway

  • Peak Hour Response, ensuring congestion mitigation during festive or weekend travel surges



TIA: A Mandatory Milestone for RSA Compliance


As per Lembaga Lebuhraya Malaysia (LLM) regulations, all new RSA developments must undergo a comprehensive Traffic Impact Assessment. With Rekarunding Trafik’s expert guidance, EVCC™ Pedas RSA has met and exceeded this requirement—ensuring a development that is not only visionary but fully aligned with regulatory and safety standards from day one.


Learn more about the integrated planning behind EVCC™ Pedas RSA at www.evcc.my